{"{0} days":"{0}天","{0} days left in the 180 days ending that day":"截至当天的180天内还剩{0}天","{0} minutes":"{0}分钟","A finish time earlier than the start counts as a night shift past midnight. Overtime is counted per day or per week, whichever gives more hours, and never twice; leave a limit empty to skip it. Overtime law differs between countries and contracts, so check what applies to you.":"结束时间早于开始时间时，将按跨午夜的夜班计算。加班时间按天或按周计算，取较多的小时数，且不会重复计算；留空某项上限即可跳过该项。不同国家和合同的加班规定各不相同，请确认适用于您的规定。","Add a trip":"添加行程","Amount":"金额","Break (min)":"休息（分钟）","Break, {0}":"休息，{0}","Changing the number of segments clears the records.":"更改分段数量会清除记录。","Check on":"检查日期","Clear records":"清除记录","Clear the personal best and best segments?":"要清除个人最佳成绩和最佳分段吗？","Day":"天","Days":"天数","Days used on {0}":"{0}已使用天数","Days you want to stay":"计划停留天数","Delete all":"全部删除","Delete entry":"删除条目","Delete every saved entry?":"要删除所有已保存的条目吗？","Delta":"差值","Download CSV":"下载CSV","Earliest entry for {0} days":"{0}天的最早入境日期","Edit segments":"编辑分段","Employee signature":"员工签名","End":"结束","Entries are saved in this browser only, and a running timer keeps going if you close the tab. Starting a new task stops the current one. Rounding applies to each entry, as many invoicing rules do; download a CSV for a spreadsheet or invoice.":"条目仅保存在此浏览器中；即使关闭标签页，正在运行的计时器也会继续计时。开始新任务会停止当前任务。每个条目都会进行舍入，这与许多开票规则一样；您可以下载CSV，用于电子表格或发票。","Entry":"入境","Entry date, trip {0}":"入境日期，行程{0}","entry not allowed that day":"当天不允许入境","Everything":"全部","Exact":"精确","Exit":"出境","Exit date, trip {0}":"出境日期，行程{0}","Finish":"完成","Finish, {0}":"完成，{0}","Gross pay":"税前工资","Hourly rate (optional)":"时薪（可选）","Hours":"小时","leave by {0}":"最迟于{0}离开","Longest stay from {0}":"从{0}开始的最长停留时间","Name":"名称","New personal best!":"新的个人最佳成绩！","No project":"无项目","Open splits file":"打开分段文件","Overtime":"加班","Overtime after (hours a day)":"超过以下时长后计为加班（每天小时数）","Overtime after (hours a week)":"超过以下时长后计为加班（每周小时数）","Overtime hours":"加班小时数","Overtime multiplier":"加班倍数","Personal best":"个人最佳成绩","Planned entry":"计划入境","Press Space to start and to split, Backspace to undo a split, and R to reset. Green deltas are ahead of your personal best, red behind; a star marks a best segment. Records are kept in this browser; save a splits file to keep them elsewhere.":"按空格键开始和分段，按Backspace撤销分段，按R重置。绿色差值表示领先个人最佳成绩，红色表示落后；星号表示最佳分段。记录保存在此浏览器中；保存分段文件即可在其他位置保留记录。","Print timesheet":"打印工时表","Project":"项目","Regular hours":"正常工作小时数","Remove":"移除","Remove trip {0}":"移除行程{0}","Reset (R)":"重置（R）","Reset the week":"重置本周","Round each entry up to":"将每个条目向上舍入至","Run finished.":"运行完成。","Save segments":"保存分段","Save splits file":"保存分段文件","Schengen calculator":"申根计算器","Segment":"分段","Segments, one per line":"分段，每行一个","Short stays in the Schengen area are limited to 90 days in any 180-day period. On any day, count back 180 days, that day included: no more than 90 of them may be spent in the area, and the days of entry and exit both count. Your trips are saved in this browser only. This is a guide; border officers decide, and long-stay visas and residence permits follow other rules.":"在任何180天期限内，在申根区的短期停留不得超过90天。在任意一天向前回溯180天（包括当天）时，其中在申根区停留的天数不得超过90天，入境日和出境日均计入。您的行程仅保存在此浏览器中。本工具仅供参考；最终由边境官员决定，长期签证和居留许可适用其他规定。","Show":"显示","Speedrun timer":"速通计时器","Split":"分段","Split (Space)":"分段（空格键）","Start":"开始","Start (Space)":"开始（空格键）","Start, {0}":"开始，{0}","Stop":"停止","Sum of best segments":"最佳分段总和","Supervisor signature":"主管签名","Switch to this":"切换到此项","Task":"任务","That file is not a splits file saved by this timer.":"该文件不是此计时器保存的分段文件。","This week":"本周","Time":"时间","Time tracker":"时间追踪器","Timesheet":"工时表","Timesheet template":"工时表模板","Today":"今天","Total":"总计","Total hours":"总小时数","Trip {0} ends before it starts.":"行程{0}的结束时间早于开始时间。","Trip {0} needs both dates.":"行程{0}需要填写两个日期。","Trip {0} overlaps another trip.":"行程{0}与其他行程重叠。","Undo split (Backspace)":"撤销分段（Backspace）","Week starting":"周起始日","Week starting {0}":"周起始日为{0}"}